This page follows one user goal from the browser to a release in three sequence diagrams. Then it shows the status state machines.

The path uses these stable IDs.

Object ID rule Source
Change chg_<uuid>. Idempotent on clientRequestId per requester. workers/api/src/projects.ts
ChangeWorkflow instance The Change ID workers/api/src/projects.ts
Task tsk_<change>_<key>, where <change> is the Change ID without chg_ and <key> is t1, t2, … workers/integration/src/change-workflow.ts
Agent agt_<task>: one logical Agent per Task workers/integration/src/dispatch.ts
Task run run_<task>_<attempt> workers/agents/src/agent-do.ts
ChangeSet cs_<run> workers/agents/src/agent-do.ts
Candidate cand_ plus the first 24 hex characters of the SHA-256 composition key workers/integration/src/candidate-create.ts
Release rel_<project>_<generation> workers/integration/src/release-model.ts

The API stores the Change and starts one ChangeWorkflow (request field startPlanning, default true). The API returns before any model call.

A request of a member waits for review first (ADR 0028):

  • While the Project setting memberRequestReview is on, the API stores the request as proposed. It starts no ChangeWorkflow.
  • When an owner or admin includes the request, the Change becomes created at the current Canonical Generation.
  • The integration code then starts the ChangeWorkflow with the same instance ID.
  • Shared Projects describes the review.

The ChangeWorkflow runs the intake gate, calls the Root Planner, and compares the plan with the other open requests. Then it stores the Work Graph and dispatches the ready Tasks.

  • An unclear, duplicate, or conflicting request waits for its requester (needs_input).
  • A request that conflicts with an earlier request of another person waits for the choice of that person (awaiting_choice, ADR 0032).
  • After “apply theirs”, the request is queued. It plans again after the earlier request promotes or ends.

The intake gate reads the request as a change to the current app. It reads the canonical file paths, the package.json name and description, the start of the README.md, and recent request titles. It asks only when two readings build materially different products. Each question has its own answer, with the readings as options and “Something else”. Small details, such as colors, sizes, and defaults, go to the Root Planner as assumptions. The intake gate asks at most one round. After an answer, or after “Build it as it is”, the request goes to planning. Shared Projects describes the intake gate, the request comparison, and first-come conflicts (ADR 0025, ADR 0032).

sequenceDiagram
  autonumber
  actor User
  participant API as API (core)
  participant Root as ProjectRootDO
  participant DB as Product database
  participant CW as ChangeWorkflow
  participant GW as Models (Anthropic, embed, rerank)
  participant Shard as ResourceShardDO
  participant WQ as agent-wakeups queue

  User->>API: POST /v1/projects/:id/changes (through the web app)
  API->>Root: getCanonical()
  alt a member's request, review on
    API->>DB: INSERT changes (status proposed)
    API-->>User: 201 Change (proposed)
    User->>API: POST /v1/changes/:id/include (owner or admin)
    API->>DB: integration RPC includeChange: status created
    API->>CW: integration CHANGE_WORKFLOW.create(id = changeId)
  else owner or admin, or review off
    API->>DB: INSERT changes (status created)
    API->>CW: CHANGE_WORKFLOW.create(id = changeId)
    API-->>User: 201 Change
  end
  CW->>DB: status compiling
  CW->>GW: intake gate (embeddings, reranker, Clef-flash, Sonnet)
  opt unclear or duplicate (at most one intake round)
    CW->>DB: status needs_input, clarification
    User->>API: POST /v1/changes/:id/clarify
    API->>CW: integration RPC clarifyChange, event clarification
  end
  CW->>Root: admit()
  CW->>GW: Root Planner, tool submit_work_graph
  GW-->>CW: WorkGraphPlan (Zod and cycle check)
  CW->>Root: registerScope(), then compare with each earlier request
  opt supported conflict with an earlier request of another person
    CW->>DB: request_choices row, status awaiting_choice
    User->>API: POST /v1/changes/:id/choose (the earlier requester)
    API->>CW: integration RPC chooseFirstCome, event first_come
    CW->>GW: apply theirs or moot: Root Planner on the current tree
  end
  CW->>DB: tasks, task_dependencies, title, assumptions, status running (one batch)
  CW->>Shard: change.compiled, task.created (outbox)
  CW->>DB: pending to ready when dependencies are completed
  CW->>Shard: task.ready (outbox)
  CW->>WQ: one agent.wake per ready Task

Notes:

  • The Root Planner routes to the opus tier (taskKind = plan, complexity = large). With ALLOW_OPUS set to false (the default), the opus tier runs on Sonnet 5.5 (ADR 0021).
  • The plan has a short title for the request, at most 6 words. The planner sees the goal with the clarification answers, so the title names the final request.
  • parsePlan cuts the title to 48 characters at a word boundary. A missing title never causes a repair turn.
  • The ChangeWorkflow writes the title to changes.title with the Tasks. Without a title, the API shows fallbackTitle(goal) (packages/protocol/src/change-title.ts).
  • The plan has assumptions: up to 8 small product details that the goal leaves open and that the planner decided, for example colors, sizes, or defaults.
  • The planner also gets the open details that the intake gate found. parsePlan drops bad entries and cuts the list, so assumptions never cause a repair turn.
  • The ChangeWorkflow writes the assumptions to changes.assumptions_json (0032_change_assumptions.sql). The Change page shows them as “Assumptions”.
  • To change an assumption, the requester sends a follow-up request.
  • The prompt asks for 2 to 8 Tasks. The schema accepts 1 to 12 (MAX_TASKS_PER_CHANGE). The planner makes at most two model calls: the plan and one repair turn.
  • A UI Task that calls routes of another Task must depend on that Task. The prompt states the rule.
  • parsePlan (workers/integration/src/root-planner.ts) also repairs the plan without a model call.
  • It adds the edge UI → API between a UI Task and an API Task on the same area when no dependency path joins them.
  • The area is the first resource segment, for example todos in todos:ui and todos:api.
  • Every UI Task edits public/index.html, and every API Task edits src/app.ts. Two Tasks of one kind built in parallel on one base do not merge.
  • So parsePlan also runs Tasks of one kind in plan order when no dependency path joins them. The later key depends on the earlier key (serializeSameSurface).
  • A UI Task and an API Task still run in parallel.
  • The Work Graph JSON goes to the object store at work-graphs/<project>/<change>.json.
  • Change Events go to the ResourceShardDO that owns change:<id>. This keeps ProjectRootDO cold.
  • The API writes the Change to ProjectViewDO directly.
  • The intake gate records change.intake.reviewed and an INTAKE Decision Receipt in change_decisions. An answer records change.clarification.answered.
  • An awaiting_choice or queued Change waits for the event first_come. It runs advanceFirstCome after each wake.
  • It also wakes every 6 hours while the choice is open, and every hour while it is queued. After 7 days without a choice, the Change is not_selected.
  • A needs_input Change waits for the event clarification and reads the database once a day. After 7 days without an answer, the Change is cancelled.
  • The intake gate asks at most one round. The request comparison can ask more rounds. After 3 answered rounds in total, the Change plans without another question.

Part 2: from a wake to a published ChangeSet

Section titled “Part 2: from a wake to a published ChangeSet”

Each wake starts one AgentDO run. The Agent works in its own Git fork and Sandbox directory. When the run ends, the Agent publishes a ChangeSet and declares a typed Intent. The ResourceShardDO then detects conflicts. Agents and models describes the run, model routing, and the Pi loop.

sequenceDiagram
  autonumber
  participant WQ as agent-wakeups queue
  participant AC as Wake consumer
  participant DB as Product database
  participant A as AgentDO (Pi)
  participant GW as Anthropic API
  participant Art as git service
  participant SBX as Sandbox
  participant Shard as ResourceShardDO
  participant ER as Event router

  WQ->>AC: agent.wake (task_ready)
  AC->>DB: admitAgent: ready to assigned (max 8 per Change)
  AC->>Shard: task.assigned, agent.woken
  AC->>A: start(input)
  A->>DB: route tier, MODEL_ROUTE Decision Receipt, status running
  A->>Shard: model.route.decided, task.started, advisory Claims
  loop Pi tool loop (max 16 model calls on haiku, 32 on sonnet and opus)
    A->>GW: model call
    A->>Art: fork canonical as ws-{run} (first workspace tool call)
    A->>SBX: read_file, edit_file, write_file, run_command in /workspace/{run suffix}
  end
  A->>SBX: git commit and push to ws-{run}
  A->>DB: changesets (proposed), task completed
  A->>Shard: changeset.proposed, intent.declared, task.completed
  Shard-->>ER: event records from the outbox (JetStream)
  ER->>DB: dedupe, find newly ready Tasks
  ER-->>WQ: change.dispatch on the integration queue, which sends the next wakes

Notes:

  • Only Task kinds implement, migrate, and test get a workspace. Other kinds get read-only file tools.
  • A Task with dependencies starts on a stacked workspace: canonical plus the dependency ChangeSets. See Agents and models.
  • Conflict detection is deterministic and runs before task.completed.
  • Conflict detection never compares two Tasks that a Work Graph path joins, in either direction and through any number of edges.
  • The later Task of such a pair runs on a workspace that holds the work of the earlier Task, so the two are not rival designs.
  • A later Task that breaks the earlier work fails the checks of the Candidate.
  • A model review (Sonnet tier, then Opus tier) runs later from a durable schedule, off the run path.
  • Conflict detection and conflict review read protected resources from the Project policy row (project_policies, protectedResources).
  • A Project without a row, or with a row that does not parse, has no protected resources for them.
  • When the last Task completes, AgentDO moves the Change to verifying and records verification.started with reason work_graph_completed.

The causal router turns verification.started into one candidate.create command. The integration code applies the integrate rule, then the fork rule. It starts one CandidateVerificationWorkflow per Candidate. Sibling Candidates on one base wait for each other. The last one to settle selects the winner (ADR 0026). Policy or a person promotes the winner. ProjectRootDO runs the compare-and-swap.

sequenceDiagram
  autonumber
  actor User
  participant ER as Event router
  participant INT as Integration
  participant VW as CandidateVerificationWorkflow
  participant SBX as Sandbox
  participant DB as Database and object store
  participant Root as ProjectRootDO
  participant Art as git service
  participant RW as ReleaseWorkflow

  ER->>INT: candidate.create (integration queue)
  INT->>DB: fork rule, INSERT candidates (composing, max 3)
  INT->>VW: create(id = candidateId)
  VW->>Art: fork canonical as cand-{id}
  VW->>SBX: merge ChangeSets in Work Graph order
  VW->>DB: plan_json, status verifying, candidate.composed
  loop each check in the Verification Plan
    VW->>SBX: run check (or apps service, or acceptance model call)
    VW->>DB: Evidence row, output object
  end
  VW->>DB: gate: verified or rejected
  VW->>DB: last sibling: claim selection, rank, reject losers, candidate.selected
  VW->>DB: approval.requested for a gated winner
  User->>INT: POST /v1/changes/:id/approve (API RPC decideApproval)
  User->>INT: POST /v1/candidates/:id/promote (API RPC promoteCandidate)
  INT->>Root: promote(): compare-and-swap
  Root->>Root: generation + 1 and canonical.advanced in one transaction
  INT->>Art: point canonical main at the composed commit
  INT->>RW: startRelease (only a Project with a live app)
  RW->>RW: move the live app pointer, then smoke check

Notes:

  • The integrate rule runs before the fork rule.

  • A confirmed or fork_required conflict between two Tasks on different semantic resources (an API and its UI) creates no Candidate.

  • For such a conflict, the dependent Task gets a dependency edge. It runs again one time on a stacked workspace with the ChangeSet of the other Task.

  • The Change goes back to running. One Candidate then holds both ChangeSets.

  • Two Tasks of one Change that run in parallel on the same base can edit the same file. Their ChangeSets then do not merge.

  • The system then runs one Task again on top of the work of the other Task. Deterministic code decides this (settle.ts and rebase.ts in workers/integration/src):

    • A Candidate gets the rejection file_conflict on the current base. The failed Task gets dependency edges to the other Tasks of that Candidate. It runs again on a stacked workspace with their ChangeSets, together with every Task built on it. The Change goes back to running.
    • A Task fails with dependency_merge_conflict, because two of its dependencies do not merge. task.failed queues change.settle. The dependency that did not merge gets edges to the dependencies before it. It runs again on their work, with every Task built on it.
    • conflict.integrated records this re-run with trigger: "dependency_merge_conflict". A TASK_RESTACK Decision Receipt records the decision.
    • A dependency ChangeSet does not merge with the canonical base, because another request promoted while this Change ran. That dependency and every Task built on it run again on the current Canonical State with the rebase instruction.
    • The Change takes the current base generation. candidate.rebase_requested records this with trigger: "dependency_merge_conflict".
    • A Change gets at most 2 of these re-runs (MAX_TASK_RESTACKS).
    • The re-run Task gets the integrate instruction: build on the real routes, field names, and data shapes of the ChangeSet of the other Task.
  • A Change with no Task left to run never stays running.

  • When a Task failed and no Task is ready, assigned, or running, the Change ends failed. change.failed records it with phase: "tasks".

  • blocked_reason names the Task and its reason, for example “The Task on canvas:activity failed: … Submit the request again.”

  • Every 5 minutes, the event router also finds open Changes that are quiet for 3 minutes to 6 hours and cannot move on their own.

  • These are running Changes with no Task at work, and verifying Changes with no live Candidate. The router queues one change.settle per Change, at most 10 per sweep.

  • The integration code checks the Change again. Then it runs the work again, dispatches the ready Tasks, or ends the Change with its reason.

  • candidate.create waits while a conflict review that has a reservation from the last 10 minutes is open. The last queue delivery composes in all cases.

  • A verified Candidate does not promote while a sibling on the same base composes or verifies.

  • A winner that does not meet every acceptance criterion never auto-promotes. Its Change goes to awaiting_approval. See Source and verification.

  • Auto-promotion applies when three conditions are true:

    1. The winner needs no human approval.
    2. The winner meets every acceptance criterion.
    3. The autoPromoteRiskTiers of the Project policy lists the risk tier of the Change.
  • The policy is the project_policies row. Without a row, the policy is DEFAULT_POLICY (policy-1 in workers/integration/src/candidate-composer.ts).

  • DEFAULT_POLICY lists low and medium in autoPromoteRiskTiers, and high and critical in humanGateRiskTiers.

  • For auto-promotion, the CandidateVerificationWorkflow calls promoteCandidate with actor system:auto-promotion. canonical.promotion.requested records trigger: "auto".

  • Every promotion precondition applies (autoPromoteDecision in packages/evidence/src/promotion.ts).

  • These Candidates always wait for a person:

    • a high or critical Change;
    • an authorization change at any tier (the plan sets humanApprovalRequired);
    • a winner with an acceptance shortfall;
    • a Change without a risk tier, or with a tier that a stored policy does not list as automatic.

    A destructive schema change (destructiveMigration) gets the tier critical from the Root Planner, so it waits too.

  • A Candidate that waits for a person is never silent:

    • The Change goes to awaiting_approval. The status reason of the Candidate tells why.
    • approval.requested records reason and trigger (policy or acceptance).
    • The inbox tells the owner, the admins, and the requester. The Change page shows the reason under Needs attention.
    • An owner or admin approves the Candidate when approval is required.
    • Then the owner or admin ships it with Ship on the Change page or Promote on the Candidate page. Both call POST /v1/candidates/:id/promote.
  • The Change is promoting during the compare-and-swap.

  • After the compare-and-swap, the Change is releasing when the Project has a live app. Otherwise it is completed.

  • The release ends the Change as completed (deployed or superseded) or failed. See Live apps.

  • Every end after promotion records change.completed or change.failed. The projector maps build.started to releasing. These Events move ProjectViewDO out of promoting.

  • A Change that is releasing 45 minutes after promotion is stuck (RELEASE_STUCK_AFTER_MS).

  • Every 5 minutes, the event router reads changes by (status, updated_at). It queues one release.recover per stuck Change, at most 10 per sweep.

  • The integration code then checks the Change again:

    1. A release that already finished settles the Change.
    2. A queued or building release becomes failed, and the Change becomes failed.
    3. A Project without a live app completes the Change.
    4. A Project with a live app but no release row gets a failed release row, and the Change becomes failed. The generation stays promoted. The next promotion releases as usual.
  • After canonical.advanced, the causal router marks every other composing, verifying, or verified Candidate on an earlier base stale.

  • The router queues one candidates.recompose command. The integration code composes.

  • Promotion runs the same sweep (settleStaleBehind in workers/integration/src/recompose.ts).

  • The sweep takes each verified Candidate on an earlier base.

  • It also takes each stale Candidate whose Change has no other active Candidate and none on a later base. The order of the two sweeps has no effect.

  • Every stale Candidate ends in one of three states:

    • a Candidate on the current Canonical State;
    • a blocked Change with a plain reason;
    • a closed Change.
  • A lineage recomposes at most 6 times (MAX_RECOMPOSES). Each recomposition follows a promotion of another request, so a request that waits behind up to 6 others still lands.

  • A Change never waits in verifying with nothing running.

The enums are in packages/protocol/src. The diagrams show only the transitions that the code writes.

stateDiagram-v2
  [*] --> created: API insert
  [*] --> proposed: API insert, a member's request, review on
  proposed --> created: owner or admin includes it
  proposed --> declined: owner or admin declines it
  proposed --> cancelled: the requester withdraws it
  created --> compiling: ChangeWorkflow
  compiling --> needs_input: unclear, duplicate, or undecided conflict
  needs_input --> compiling: answer or proceed anyway
  needs_input --> cancelled: withdrawn, or no answer in 7 days
  compiling --> failed: planner failed
  compiling --> not_selected: the same requester asked again
  compiling --> awaiting_choice: conflict with an earlier request of another person
  awaiting_choice --> not_selected: keep mine, or no choice in 7 days
  awaiting_choice --> queued: apply theirs, earlier request in flight
  awaiting_choice --> compiling: earlier request ended (moot or apply theirs)
  queued --> compiling: earlier request promoted or ended
  awaiting_choice --> cancelled: withdrawn
  queued --> cancelled: withdrawn
  compiling --> running: Work Graph stored
  compiling --> budget_blocked: a budget refused a planner or intake call
  budget_blocked --> compiling: budget raised while planning
  running --> budget_blocked: budget or limit stop
  budget_blocked --> running: person raises the budget
  running --> verifying: last Task completed
  verifying --> running: Tasks re-run after a merge conflict or an integration
  verifying --> blocked: merge conflict after 4 re-runs, or stale Candidate not rebuilt
  blocked --> verifying: budget raise recomposes the stale Candidate
  verifying --> failed: no Candidate can ship
  verifying --> awaiting_approval: winner needs a person
  awaiting_approval --> verifying: no verified Candidate left
  verifying --> promoting: promotion requested
  awaiting_approval --> promoting: promotion requested
  promoting --> verifying: compare-and-swap refused
  promoting --> releasing: advanced, live app exists
  promoting --> completed: advanced, no live app
  releasing --> completed: deployed or superseded
  releasing --> failed: release failed or stuck

The pure rules are in workers/integration/src/change-status.ts.

Rule Source
A person can cancel a Change in proposed, created, compiling, needs_input, awaiting_choice, queued, running, verifying, awaiting_approval, budget_blocked, or blocked. Nobody can cancel a Change with a promoted Candidate. CANCELLABLE_FROM in change-status.ts, CANCEL_FROM and cancelChange in change-commands.ts
Only an owner or admin moves a proposed Change: include to created, decline to declined. Each update has a guard on proposed. A repeat returns the stored result. includeChange, declineChange in change-commands.ts
A later conflicting request of the same requester makes the earlier Change not_selected from any of these statuses. This also applies from failed or completed, when the earlier Change has no promoted Candidate. See Shared Projects. request-check.ts
Only the earlier requester chooses for an awaiting_choice Change. The system records expired after 7 days, or moot when the earlier request ends without a build. The later requester can withdraw the Change. advanceFirstCome applies each step with a guard on awaiting_choice or queued. See Shared Projects. firstComeStep, advanceFirstCome in first-come.ts
A merge conflict makes the Change run the conflicting Tasks again: on the current base, or on top of the sibling work when the base stays the same. After 4 re-runs the Change is blocked with the reason “The work of this request did not merge after four re-runs. Submit it again.” MAX_REBASE_RERUNS in rebase.ts
A running Change with a failed Task and no Task ready, assigned, or running ends as failed. blocked_reason names the Task and its reason. A verifying Change with no live Candidate, whose re-runs are used up, first gets its one repair Task when the newest Candidate failed a required check or the preview check. Otherwise it ends as failed with the reason of its newest Candidate: “No Candidate passed its required checks: …”, or “The agents’ work did not merge (…)” when the newest rejection is a merge. Both end with “Submit the request again.” settleChange in settle.ts
The Change ends as failed when four conditions are true. Every Candidate on the latest base is rejected, and none for a cancel. The latest of them is not a merge conflict. A merge conflict waits for its re-run only until the Candidate of the re-run exists. No Candidate of the Change is composing, verifying, verified, or promoted. blocked_reason starts with “No Candidate passed its required checks:” and quotes the Candidate reasons. change.failed records it with phase: "verification". verificationDeadEnd
A refused compare-and-swap returns the Change to its status before promoting. leavePromoting in promotion.ts
A verified Candidate can also promote from running or budget_blocked. PROMOTABLE_FROM
completed, cancelled, failed, not_selected, and declined are terminal. TERMINAL_CHANGE_STATUSES

POST /v1/changes/:changeId/cancel:

  1. Cancels the open Tasks and rejects the open Candidates (reason change cancelled).
  2. A cancel during compiling stores the planned Tasks as cancelled and records no compile.
  3. A running CandidateVerificationWorkflow checks the Change at each step boundary. It stops before it uses more Sandbox or browser time.
  4. Dispatch runs only for a running Change.
  5. An active Agent run stops at once. cancelChange calls AgentDO.stopIfCancelled for each Task in assigned or running.
  6. stopIfCancelled aborts the model call in flight and releases the Claims and the Sandbox. When that call fails, the run stops at its next run check (every 60 s).
  7. A cancelled Task stays cancelled. Its run ends with no retry, no escalation, and no task.failed Event.

POST /v1/changes/:changeId/budget raises budget_usd. The budget cannot go down.

  1. A budget_blocked Change goes back to running.
  2. A Change that a budget stopped while planning has no Tasks. It goes back to compiling, and a second ChangeWorkflow instance plans it again.
  3. compiling and running are the only statuses that a budget stop interrupts.
  4. The budget-stopped Tasks become ready again with a fresh attempt window. Their blocked dependents become pending.
  5. The normal dispatch runs.
  6. On a verifying, blocked, or awaiting_approval Change, the same call retries a merge-conflict re-run within its bound. It also recomposes a stale Candidate.

A raise of the Project monthly budget (PATCH /v1/projects/:projectId) or of a user monthly budget (PATCH /v1/me/budget) runs the same restore for each Change that budget stopped (resumeBudgetBlocked in change-commands.ts, ADR 0030).

stateDiagram-v2
  [*] --> pending: ChangeWorkflow insert
  pending --> ready: dependencies completed
  pending --> blocked: a dependency failed or stopped
  ready --> assigned: admitAgent (slot free)
  ready --> ready: deferred at 8 active Agents
  ready --> blocked: wake dead-lettered
  assigned --> blocked: wake dead-lettered
  assigned --> running: AgentDO.start
  running --> running: retry or escalate
  running --> completed: complete_task and publish
  running --> failed: terminal failure
  running --> blocked: budget or limit stop
  blocked --> ready: dead letter retried, or budget raised
  completed --> pending: re-run after a merge conflict or an integration

A Change cancel moves the open Tasks (pending, ready, assigned, running, blocked) to cancelled. A merge-conflict re-run sets a Task to ready directly when none of its dependencies re-runs.

stateDiagram-v2
  [*] --> composing: candidate row inserted
  composing --> verifying: composed, plan recorded
  composing --> rejected: incompatible, merge conflict, or Sandbox budget reached
  verifying --> verified: every required check passes
  verifying --> rejected: a required check fails or has a gap
  verified --> rejected: approver rejects, or a sibling wins the selection
  verified --> promoted: compare-and-swap succeeds
  composing --> stale: canonical advanced
  verifying --> stale: canonical advanced
  verified --> stale: canonical advanced
  stale --> rejected: Change cancelled, or its Tasks re-run
  promoted --> [*]
  rejected --> [*]

composed is in the enum and in RPC results. Database rows go from composing directly to verifying. Rhumbatron never retries a stale Candidate blind. A second Candidate on the current base takes its place.

stateDiagram-v2
  [*] --> queued: promotion with a live app
  queued --> building: generation still canonical
  queued --> superseded: later generation promoted
  queued --> failed: not canonical, no app, or stuck
  building --> superseded: later generation promoted
  building --> failed: no bundle, or the pointer did not move
  building --> deployed: smoke check passed
  building --> smoke_failed: smoke check failed
  deployed --> smoke_failed: failure injection
  failed --> [*]
  smoke_failed --> [*]
  superseded --> [*]